Home page >> Republican proving ground >> History
History

The first stage
Construction dynamometric road
(2007-2008)

Clearing the site for building
(May 2007)
The vertical design of the road (July 2007)
General view of the subgrade dynamometric road
(September 2007)
Formation of pavement (August 2007)
Formation of pavement (August 2007)
General view of the dynamometric road
(April 2009)


The second stage
Accessory buildings and structures
(2010)

 

The project provides the construction of the hangar to prepare the machines for testing and laboratory and community building.

  • Hangar for test consists of a building with planning dimensions 48 x 36,7 m, divided into several functional areas: a section for the preparation of long-measuring vehicles, a section for the preparation of cars, stocking area for balance weight.
  • Laboratory and community building is a construction with planning dimensions of 12 x 24 m, adjacent by one wall to a butt part of the hangar.